PlatformRuvuma EnergyTanzania EntityMtwara LNG LtdMozambique EntityRuvuma Energy Industrial Park, LtdPlatform CAPEX$5.12 bnLNG Capacity4.11 MTPA · 3 TrainsLNG OEMBaker Hughes NMBL™Gas-to-Power450 MW GTCC · GE 9F-classNet Grid Export270 MW · TANESCO + EDMEco-Industrial Park810 ha · TZ + MZVP Network8 Hubs · 5 CountriesDirect Jobs10,000+ CreatedEPC LeadSamsung E&AFID SPV1 + SPV3Q4 2026FID SPV2Q1 2027First LNG Cargo2030Full Platform2032HoldCoMauritius-domiciledStructureDBFOMT PPP · BinationalConsortiumViability Gap · N-Gas · GEFCOPlatformRuvuma EnergyTanzania EntityMtwara LNG LtdMozambique EntityRuvuma Energy Industrial Park, LtdPlatform CAPEX$5.12 bnLNG Capacity4.11 MTPA · 3 TrainsLNG OEMBaker Hughes NMBL™Gas-to-Power450 MW GTCC · GE 9F-classNet Grid Export270 MW · TANESCO + EDMEco-Industrial Park810 ha · TZ + MZVP Network8 Hubs · 5 CountriesDirect Jobs10,000+ CreatedEPC LeadSamsung E&AFID SPV1 + SPV3Q4 2026FID SPV2Q1 2027First LNG Cargo2030Full Platform2032HoldCoMauritius-domiciledStructureDBFOMT PPP · BinationalConsortiumViability Gap · N-Gas · GEFCO
LNG industrial facility
Platform Components

Four Integrated Components

Ruvuma Energy combines liquefaction, power generation, industrial hosting, and regional distribution into a single DBFOMT PPP — three ring-fenced SPVs at single financial close.

SPV2

LNG Liquefaction Complex

Mahurunga Village, Mtwara, Tanzania

CAPEX
USD 2.86B
Capacity
4.1 MTPA (3 trains)
LNG Liquefaction Complex — Ruvuma Energy SPV2
SPV2 · Mahurunga Village, Mtwara, Tanzania

The core liquefaction facility processes Ruvuma Basin gas from Tanzania and Mozambique through three ISO-compliant trains, producing 4.1 MTPA of LNG for export and regional distribution.

Key Features

  • Feed gas pre-treatment: mercury, CO₂, moisture, and hydrocarbon removal
  • ISO-compliant trains with dehydration and NGL recovery systems
  • Three full-containment cryogenic tanks with 7-day emergency reserve
  • Ground flares, ESDs, gas detectors per international LNG standards
  • Modular scalability: Phase 1 (1.5 MTPA) → Phase 2 (4.1 MTPA)
  • Integrated with 300 MW power island via Baker Hughes NovaLT™
Technical Specifications
TechnologyCryogenic liquefaction at -162°C
Train Count3 trains (Phase 1: Trains 1+2)
Phase 1 Capacity1.5 MTPA (FID 2026)
Full Capacity4.1 MTPA (all 3 trains)
EPC BasisSamsung E&A
OEMBaker Hughes NMBL/LM9000
Storage3 × 50,000 m³ full-containment cryogenic tanks
BOG Recovery24/7 monitoring with boil-off gas recovery
First Cargo2030
DSCR8.77×
SPV3

Virtual Pipeline System

Tanzania · Mozambique · Zambia · Kenya · DRC

CAPEX
USD 225M
Capacity
10 hubs · 25 MMSCFD
Virtual Pipeline System — Ruvuma Energy SPV3
SPV3 · Tanzania · Mozambique · Zambia · Kenya · DRC

A 10-hub regional distribution network deploying LNG/CNG via virtual pipeline — road, rail, and ISO tanker fleets — to reach markets without pipeline infrastructure across five countries.

Key Features

  • NGV conversion and training centres at each hub
  • LNG/CNG refuelling corridors along major transport routes
  • Cryogenic ISO tanker fleet for last-mile delivery
  • Diesel displacement programme for mining and industrial clients
  • Cross-border regulatory framework under SADC/EAC
  • Revenue diversification: fuel sales, conversion services, O&M contracts
Technical Specifications
Hub Count10 regional distribution hubs
Total Capacity25 MMSCFD (10 × 2.5 MMSCFD)
TZ Hubs3 (Dodoma, Arusha, Mbeya)
MZ Hubs3 (inland mining towns)
ZM Hubs2 (Copperbelt fuel switch)
KE Hubs1 (logistics & industry)
DRC Hubs1 (off-grid industry)
FinanceIFC revolving facility
Equity60%
Plateau2032
SPV1

Eco-Industrial Park + Power

Tanzania 405 ha · Mozambique 405 ha

CAPEX
USD 1.41B
Capacity
810 ha · 300 MW
Eco-Industrial Park + Power — Ruvuma Energy SPV1
SPV1 · Tanzania 405 ha · Mozambique 405 ha

An 810 ha binational Eco-Industrial Park — the sovereign PPA anchor for the platform — powered by a 300 MW Baker Hughes NovaLT™ gas plant with net 220 MW exported to the TANESCO/EDM grid.

Key Features

  • Baker Hughes NovaLT™ high-efficiency gas turbines (3 × 100 MW)
  • Smart utilities: zero-liquid discharge, centralised cooling, rooftop solar
  • Biogas digesters and WtE facility: 20,000 TPA ammonia
  • Paved roads, truck terminals, multimodal cargo hubs linked to port/rail
  • IFC Performance Standards · LEED Gold target · EU emissions compliance
  • Biodiversity corridors, stormwater management, housing zones
Technical Specifications
Total EIP Land810 ha (TZ 405ha + MZ 405ha)
Power Installed300 MW (3 × 100 MW NovaLT™)
Net Power Export220 MW to TANESCO/EDM
Industrial Sheds30 sheds (20 × 11,000 m² + 10 × 5,500 m²)
Anchor SectorsCement · Steel · Fertiliser · Agri-industrial
FinanceAFC/AfDB/KfW @ 7.5% · 15yr · 3yr grace
ECA Cover20% @ 5.5% · 18yr
DSCR2.02×
First Ops2028
StructureSovereign PPA anchor
Marine

Marine Export Jetty & RSRT

Mtwara Port, Tanzania

CAPEX
Included in SPV2
Capacity
Multi-berth · LNG carrier + ISO tanker
Marine Export Jetty & RSRT — Ruvuma Energy Marine
Marine · Mtwara Port, Tanzania

Multi-berth marine export terminal enabling LNG carrier and ISO tanker loading for export to India, Kenya, Mozambique, Zanzibar, and regional markets, plus domestic regasification at 50 bar.

Key Features

  • LNG carrier loading for international export routes
  • ISO tanker bay for regional VP fleet resupply
  • Domestic high-pressure regasification for grid injection
  • 50,000 m³ emergency buffer tank with full safety redundancies
  • Joint EPC scope with LNG liquefaction facility (Samsung E&A)
  • Full ISPS maritime security compliance
Technical Specifications
BerthsMulti-berth (LNG carrier + ISO)
Export MarketsIndia · Kenya · Mozambique · Zanzibar
RegasificationHigh-pressure 50 bar domestic supply
Emergency Tank50,000 m³ · 7-day capacity
EPC IntegrationJoint with 100 MW power plant
SafetyFull ESDs, gas detection, surveillance

Investment Rationale

Understand why Ruvuma Energy's integrated structure delivers superior DSCR, risk distribution, and bankability versus standalone project approaches.

View Investment Case