PlatformRuvuma EnergyTanzania EntityMtwara LNG LtdMozambique EntityRuvuma Energy Industrial Park, LtdPlatform CAPEX$5.12 bnLNG Capacity4.11 MTPA · 3 TrainsLNG OEMBaker Hughes NMBL™Gas-to-Power450 MW GTCC · GE 9F-classNet Grid Export270 MW · TANESCO + EDMEco-Industrial Park810 ha · TZ + MZVP Network8 Hubs · 5 CountriesDirect Jobs10,000+ CreatedEPC LeadSamsung E&AFID SPV1 + SPV3Q4 2026FID SPV2Q1 2027First LNG Cargo2030Full Platform2032HoldCoMauritius-domiciledStructureDBFOMT PPP · BinationalConsortiumViability Gap · N-Gas · GEFCOPlatformRuvuma EnergyTanzania EntityMtwara LNG LtdMozambique EntityRuvuma Energy Industrial Park, LtdPlatform CAPEX$5.12 bnLNG Capacity4.11 MTPA · 3 TrainsLNG OEMBaker Hughes NMBL™Gas-to-Power450 MW GTCC · GE 9F-classNet Grid Export270 MW · TANESCO + EDMEco-Industrial Park810 ha · TZ + MZVP Network8 Hubs · 5 CountriesDirect Jobs10,000+ CreatedEPC LeadSamsung E&AFID SPV1 + SPV3Q4 2026FID SPV2Q1 2027First LNG Cargo2030Full Platform2032HoldCoMauritius-domiciledStructureDBFOMT PPP · BinationalConsortiumViability Gap · N-Gas · GEFCO
Aerial view of industrial park development
Eco-Industrial Park

810 ha Binational EIP

East Africa's most comprehensively serviced Eco-Industrial Park — gas-powered, zero-liquid-discharge, port-connected, and cross-border across Tanzania and Mozambique.

810 ha
Total EIP Area
300 MW
Power Island
30 Sheds
Industrial Units
10,000+
Jobs Created

Binational EIP Layout

The EIP spans the Tanzania–Mozambique border corridor, with 405 ha on each side. Both zones are served by the same platform utilities — gas, power, water, logistics — under a unified DBFOMT concession with TIC and EPZA operating frameworks.

Tanzania Zone (TIC)405 ha · Tanzania Investment Centre · SEZ framework
Mozambique Zone (EPZA)405 ha · Export Processing Zone Authority
Industrial Sheds — Large20 × 11,000 m² · heavy industry · cement, steel, fertiliser
Industrial Sheds — Medium10 × 5,500 m² · light manufacturing · food, pharma, assembly
Power Plant Compound300 MW NovaLT™ · substation · SCADA control
Platform Utilities HubWTP · WWTP/ZLD · biogas digesters · ICT node
Logistics HubTruck terminals · weighbridges · customs clearance · warehousing
Green Buffer15%+ of total EIP · biodiversity corridor · stormwater drainage
Housing & SocialStaff village · healthcare · training centre · canteen
EIP Schematic Layout

┌──────────────────────────────────────────────────────────────┐
│                     810 ha BINATIONAL EIP                    │
│                                                              │
│  ┌────────────────────────┐  ╔════════════════════════════╗  │
│  │  TANZANIA ZONE (405ha) │  ║ MOZAMBIQUE ZONE (405ha)   ║  │
│  │  TIC · SEZ Framework   │  ║ EPZA · Export Zone        ║  │
│  │                        │  ║                           ║  │
│  │  [■■] 20 × Large Sheds │  ║  [■■] Large Sheds        ║  │
│  │  [■] 10 × Medium Sheds │  ║  [■] Medium Sheds        ║  │
│  │                        │  ║                           ║  │
│  └────────────────────────┘  ╚════════════════════════════╝  │
│                                                              │
│  ⚡ 300 MW Power Plant    🔧 Utilities Hub    🚛 Logistics   │
│  🌿 Green Buffer (15%+)  🏠 Housing Zone   📡 ICT Node      │
│                                                              │
│  ──────────────────── Mtwara Port Corridor ────────────────  │
│                        ▼ 8 km to port ▼                      │
│                    🚢 Marine Export Jetty                    │
└──────────────────────────────────────────────────────────────┘
Mahurunga Village, Mtwara District · -10.5190°, 40.2398°

Full-Service Industrial Utilities

Power Supply
Source300 MW NovaLT™ gas power island
EIP allocation80 MW dedicated internal supply
Voltage33 kV / 11 kV distribution network
Reliability>99.5% availability target
BackupN+1 redundancy + emergency generators
TariffCompetitive industrial tariff — sovereign PPA basis
Natural Gas Supply
SourceDirect pipeline from platform gas receiving
PressureHigh-pressure 50 bar + low-pressure distribution
QualityPipeline quality — post pre-treatment
ApplicationsProcess heat, boilers, gas engines, CNG vehicles
MeteringIndividual tenant sub-metering
TariffCompetitive gas-at-gate pricing
Water & Wastewater
SupplyDesalination + groundwater blend
TreatmentCentral WTP — potable and process grades
WastewaterZero liquid discharge (ZLD) system
Industrial effluentPre-treatment + centralised WWTP
StormwaterEngineered drainage — coastal protection
Biogas20,000 TPA ammonia from digesters + WtE
ICT & Connectivity
FibreFibre optic backbone throughout EIP
ConnectivitySEACOM + EASSy undersea cable access
Mobile4G/5G coverage — shared infrastructure
Data centreEdge data centre facility
CustomsSingle window electronic customs clearance
SCADAEIP-wide utility monitoring and control
Logistics & Transport
Internal roadsPaved dual carriageway — 40-tonne axle load
Truck terminalsMulti-modal cargo hub — outbound + inbound
Port accessDedicated corridor to Mtwara Port — 8 km
RailFuture rail spur provision — Mtwara corridor
AirMtwara Airport — 45 min · charter/cargo capable
WeighbridgesAutomated weighbridge and customs check

Target Industrial Clustering

Ruvuma Energy EIP targets six anchor industry clusters — chosen for gas-intensity (reducing OPEX vs oil/diesel firing), regional supply gap, and export market readiness.

🏗️

Cement & Building Materials

Gas-fired kilns — 40% OPEX reduction vs oil/diesel firing. Regional construction boom — SADC infrastructure pipeline. Limestone and aggregate from Ruvuma corridor.

Target: 2 million TPA cement plant · 1 million TPA clinker export
⚙️

Steel & Metal Processing

DRI / EAF steelmaking — gas-based direct reduced iron. Copperbelt copper rod and wire processing. Infrastructure steel for regional construction.

Target: 500,000 TPA steel + copper processing hub
🌾

Fertiliser & Agri-Industrial

Natural gas feedstock for ammonia synthesis (Haber-Bosch). East Africa fertiliser deficit — >$2B/yr imports. WtE biogas digesters produce 20,000 TPA ammonia on-site.

Target: 300,000 TPA ammonia / urea · SADC distribution
🐟

Food Processing & Cold Chain

LNG-powered refrigeration and cold storage. Indian Ocean fish processing — tuna and pelagic. Mtwara agricultural hinterland — cashews, sesame, cotton.

Target: 200,000 TPA food processing complex
🔧

LNG/CNG Equipment Manufacturing

Co-location advantage — on-site gas and manufacturing base. ISO tanker assembly and maintenance depot. VP hub equipment localisation.

Target: Regional LNG equipment hub for East/Southern Africa
⚗️

Pharmaceutical & Chemicals

Medical oxygen generation — gas separation plant. Petrochemical feedstock — ethylene, propylene from NGL. Regional pharmaceutical manufacturing gap.

Target: Medical oxygen + speciality chemicals complex

Tanzania & Mozambique EIP Incentive Framework

Tanzania SEZ
10-year corporate tax holiday for EIP anchor tenants
Tanzania SEZ
Import duty exemption on capital equipment and raw materials
Tanzania SEZ
VAT deferral on EIP construction and commissioning
Tanzania Investment
Tanzania Investment Centre (TIC) one-stop shop service
Mozambique EPZA
Export Processing Zone benefits for Mozambique EIP zone
Mozambique EPZA
Import duty exemption on capital goods — Mozambique zone
Platform
Competitive utility tariffs — gas, power, water bundle pricing
Platform
Build-to-suit industrial shed construction (TIC/EPZA fast-track)
Platform
Shared port access — Mtwara Port preferential berthing
Platform
Joint EPC procurement — lower infrastructure cost for early tenants

Become an EIP Tenant

Tenant enquiries, build-to-suit requests, and anchor sector discussions are handled directly by the Ruvuma Energy development team. Expression of interest packs available on request.