PlatformRuvuma EnergyTanzania EntityMtwara LNG LtdMozambique EntityRuvuma Energy Industrial Park, LtdPlatform CAPEX$5.12 bnLNG Capacity4.11 MTPA · 3 TrainsLNG OEMBaker Hughes NMBL™Gas-to-Power450 MW GTCC · GE 9F-classNet Grid Export270 MW · TANESCO + EDMEco-Industrial Park810 ha · TZ + MZVP Network8 Hubs · 5 CountriesDirect Jobs10,000+ CreatedEPC LeadSamsung E&AFID SPV1 + SPV3Q4 2026FID SPV2Q1 2027First LNG Cargo2030Full Platform2032HoldCoMauritius-domiciledStructureDBFOMT PPP · BinationalConsortiumViability Gap · N-Gas · GEFCOPlatformRuvuma EnergyTanzania EntityMtwara LNG LtdMozambique EntityRuvuma Energy Industrial Park, LtdPlatform CAPEX$5.12 bnLNG Capacity4.11 MTPA · 3 TrainsLNG OEMBaker Hughes NMBL™Gas-to-Power450 MW GTCC · GE 9F-classNet Grid Export270 MW · TANESCO + EDMEco-Industrial Park810 ha · TZ + MZVP Network8 Hubs · 5 CountriesDirect Jobs10,000+ CreatedEPC LeadSamsung E&AFID SPV1 + SPV3Q4 2026FID SPV2Q1 2027First LNG Cargo2030Full Platform2032HoldCoMauritius-domiciledStructureDBFOMT PPP · BinationalConsortiumViability Gap · N-Gas · GEFCO
Gas pipeline and industrial infrastructure
Technology Platform

Proven Technology Stack

Ruvuma Energy deploys globally validated technology from Baker Hughes and Samsung E&A — the same OEM and EPC partners behind Coral FLNG, Sabine Pass, Tangguh, and Prelude.

Baker Hughes OEMSamsung E&A EPCProven Global Reference
Baker Hughes
Primary OEM — Power + Liquefaction
NovaLT™ Gas Turbines — SPV1 Power
Configuration3 × 100 MW NovaLT™ units
Total Installed300 MW
Net Grid Export220 MW (TANESCO/EDM)
Internal EIP Use80 MW
FuelPipeline natural gas · dual fuel
Efficiency>40% net thermal efficiency
EmissionsLow-NOx dry combustion system
Availability>95% nameplate availability
CoolingAir-cooled — no water consumption
ReferenceMultiple global EIP deployments
NMBL/LM9000 Liquefaction Compressors — SPV2
TechnologyBaker Hughes NMBL / LM9000 aeroderivative
ApplicationLNG liquefaction main compression trains
Trains3 trains at 4.1 MTPA total
DriverGas turbine mechanical drive
RedundancyN+1 spare compression capacity
ControlIntegrated control & safety system (ICSS)
Reference projectsTangguh LNG (Indonesia), Sabine Pass (USA)
Samsung E&A
Lead EPC — LNG Liquefaction Complex
LNG Liquefaction EPC — SPV2
Contract BasisFixed-price EPC (lump sum turnkey)
ScopeFull liquefaction facility + storage + jetty
Nameplate capacity4.1 MTPA (3 trains)
Phase 11.5 MTPA — Trains 1+2 by 2030
Feed gas pre-treatmentMercury, CO₂, moisture, NGL removal
Cryogenic processProprietary mixed refrigerant cycle
Storage3 × 50,000 m³ full-containment tanks
Design codeEN 14620, API 620, NFPA 59A
ReferenceCoral FLNG (MZ), Sabine Pass (USA), Prelude FLNG
Performance bondUSD 300M IWF — full value

Gas-to-LNG-to-Distribution Flow

01

Gas Receiving & Pre-treatment

Feed gas from Ntorya (TZ) and ENH Area 1 (MZ) enters the plant and undergoes mercury removal, CO₂ absorption (amine unit), dehydration (molecular sieve), and NGL recovery.

02

Refrigerant Compression

Mixed refrigerant (MR) compressors driven by Baker Hughes LM9000 aeroderivative turbines cool the gas progressively through a multi-stage refrigeration cycle.

03

Liquefaction at -162°C

Pre-cooled gas enters the main cryogenic heat exchangers where it is liquefied to -162°C at atmospheric pressure. LNG is produced at >93% recovery factor.

04

Storage (3 × 50,000 m³)

LNG is stored in three full-containment cryogenic tanks (inner nickel steel, outer concrete) with 24/7 BOG recovery, vapour management, and Level 1 safety instrumented systems.

05

Marine Loading & Export

LNG is transferred via insulated loading arms to LNG carriers at the multi-berth export jetty. ISO tanker bay serves the Virtual Pipeline resupply fleet.

06

Virtual Pipeline Distribution

ISO tanker trucks and CNG trailers dispatch from the platform to 10 regional hubs — delivering LNG/CNG to mines, industries, and NGV corridors across 5 countries.

Emissions vs Industry Benchmark

CO₂ intensity vs coal power
~50% lower
CO₂ intensity vs diesel generation
~30% lower
Plant fugitive methane target
<0.1% of throughput
NOx emissions (NovaLT™)
<25 ppm (dry, 15% O₂)
BOG routine venting
Zero — full BOG recovery
LNG energy density vs diesel
~60% higher per litre (regasified)

Applicable Codes & Standards

NFPA 59A
Standard for Production, Storage & Handling of LNG
LNG Facility Design
EN 14620
Design of flat-bottomed cryogenic storage tanks
Storage Tanks
API 620
Design and Construction of Large, Welded, Low-Pressure Storage Tanks
Tank Design
ISO 16924
Natural gas fuelling stations — LNG stations for vehicles
VP Hubs
IEC 60079
Explosive atmospheres — Equipment & Protection
Hazardous Area
ADR 2023
Transport of Dangerous Goods by Road
VP Fleet Transport
ISO 11120
Refillable seamless steel tubes for compressed gas
CNG Cylinders
EN 1089-3
Transportable gas cylinders — Colour coding
Gas Identification
ISPS Code
International Ship & Port Facility Security Code
Marine Terminal
IMO IGC Code
Construction & Equipment of Ships Carrying LNG
LNG Carriers
ISO 45001
Occupational Health & Safety Management Systems
All Operations
ISO 14001
Environmental Management Systems
All Operations

Technical Documentation

FEED documentation, Basis of Design, and Samsung E&A EPC scope are available to qualified technical counterparties under NDA.